Step 2 - Preliminary Quote:
~ Our quotes are very specific and provide in-depth detail into the exact processes involved with your project. We make every effort to be clear, concise and breakdown our costs best we can to create a transparent environment at first quotation opportunity.
~ Quotation is accepted within clients budget guidelines, allowing us to move into drafting & designing phase.
Step 3 - Building Design & Drafting:
~ Client accepts concept drawings, allowing the process to move into engineering phase.
Step 4 - Engineering:
~ Required soil testing is completed so engineers can determine the correct foundations needed for the project at hand.
~ Builder accepts concept drawings, allowing the building designer to complete their final drawing set.
Step 5 - Final Quotation/Pricing:
~ Final Quotation is accepted.
Step 6 - Contract Signing:
Final Construction Drawings
Final Engineering Drawings
Accepted Final Quote
Domestic Building Insurance (DBI) Certificate
Step 7 - Building Permit Application:
Using the "terms of appointment" form, we fill out & lodge the application form on clients behalf to the Relevant Building Surveyor (RBS)
Ensuring all the required documents are submitted to the RBS:
Construction Drawings
Engineering
Soil Reports
Title/Plan of Subdivision
Property Information Certificate
Domestic Building Insurance (DBI) Certificate
Any required Council or Water Authority Consents
Signed Contract
Enuring the any RFI's (request for further information) for the RBS are adhere to.
Step 8 - Construction Phase:
Base (footing) Stage
Frame Stage
Final Completion
This ensures that the project is constructed as per the structural requirements & meets relevant construction codes.
Step 9 - Project Completion (Handover):